Commercial Spaces · Landlord & Developer · Dubai, UAE

Commercial Space Fit-Out Dubai— Landlord & Developer Shell & Core Delivery

Category A base-build and shell & core delivery for landlords and developers preparing commercial units for lease across Dubai — consistent specification, fast turnaround between tenancies, and lease-ready handover.

RNM delivers Category A base-build and multi-unit portfolio fit-out in-house — design, documentation, Dubai Municipality approvals, and construction — under one fixed-price contract, so units are lease-ready on your leasing timeline. See our commercial design service or speak to our team today.

6+
Years in UAE
30+
Category A Units Delivered
100%
DM-Approved
category a fit-out dubai – RNM Interiors landlord shell and core base build
Cat A
Base-Build
Multi
Unit Rollout
Lease
Ready Handover

Single-Contractor Delivery

Design, documentation, and construction delivered by one team under one contract — no coordination between separate consultants and contractors required from you.

Consistent Spec Across Units

The same Category A standard delivered floor to floor or unit to unit — so every space you lease meets the same finish, and the same tenant expectation.

Fast Turnaround Between Tenancies

Vacant units refurbished and back to Category A standard quickly — minimising void periods between an outgoing and incoming tenant.

What We Deliver

Commercial Space Delivery for Landlords & Developers

From a single vacant unit to a multi-floor portfolio — RNM delivers commercial base-build and landlord-side fit-out across Dubai to a consistent, lease-ready standard.

01

Category A Base-Build

Shell-and-core to Category A standard — suspended ceilings, raised access flooring, MEP first-fix, and perimeter finishes ready for tenant fit-out.

Commercial Design →
02

Shell & Core to Category A Upgrade

Bringing a bare shell-and-core unit up to a marketable Category A standard — the base condition most tenants expect before committing to a lease.

Fit-Out Contracting →
03

Multi-Unit Landlord Rollout

Consistent Category A delivery across a full floor, tower, or portfolio — one design standard and one contractor managing every unit.

Design & Build →
04

Common Area & Lobby Refresh

Landlord-owned common areas, lobbies, and corridors refreshed to support the building's leasing position — separate from individual tenant units.

Space Planning →
05

Vacant Unit Refurbishment Between Tenancies

Fast-turnaround refurbishment of an outgoing tenant's unit back to Category A standard — minimising the void period before the next lease begins.

Turnkey Fit-Out →
06

Tenant Fit-Out Criteria Manual

Design guidelines prepared for incoming tenants' Category B fit-out — permitted finishes, MEP capacity, and submission requirements, set by the landlord.

Cost Guide →
category a office floor business bay dubai – RNM Interiors landlord base build delivery
30+
Category A Units Delivered
Why RNM Interiors

Built for Landlords Who Need to Lease Fast.

Every month a unit sits vacant is a cost to your leasing income. RNM delivers Category A base-build to a consistent standard and a predictable programme, so units are marketable and lease-ready on the timeline your leasing team needs.

01

Single-Contractor Delivery

Design and construction under one contract — no separate consultant appointments slowing down a portfolio programme.

02

Consistent Multi-Unit Specification

The same finish standard delivered across every unit in a rollout — so your leasing team is marketing a known, repeatable product.

03

Fast Turnaround Between Tenants

Vacant unit refurbishment programmed to minimise void periods — a returned unit doesn't sit empty waiting on a contractor.

04

Fixed-Price Contract

Agreed cost before work begins across every unit in the programme — predictable capex, no variation order surprises.

Delivery & Tenant Handover

Category A Delivery & Tenant Handover — Managed by RNM

A landlord fit-out programme has to align with your leasing pipeline, not the other way round. RNM sequences delivery against your leasing timeline and hands each unit over ready for tenant Category B fit-out to begin.

01
At Consultation

Portfolio Scope & Leasing Timeline Review

We review how many units are in scope, current shell condition, and your leasing pipeline, then confirm a realistic delivery sequence — whole-floor at once, or unit-by-unit as leases are signed.

Portfolio scope confirmed At consultation — no charge
02
Design Stage

Landlord Specification & DM Drawings

A Category A specification is agreed once and applied consistently across every unit, with Dubai Municipality-standard drawings produced for the full scope in parallel.

Included in design fee One spec, applied consistently
03
Submission

DM & Developer Approvals Submitted

RNM submits Dubai Municipality drawings and any developer or building management approvals required for the base-build works — tracked centrally across the full portfolio scope.

Submitted by RNM Typically 2–4 weeks
04
Execution

Multi-Unit Sequencing Across Floors or Portfolio

Works are sequenced to match your leasing pipeline — prioritising units closest to lease signature, and keeping occupied units on the same floor undisturbed where possible.

Leasing-priority sequencing Occupied-unit protocols observed
05
Tenant Criteria Manual

Category B Design Guidelines Prepared for Incoming Tenants

Where required, RNM prepares a tenant fit-out criteria manual — permitted finishes, MEP capacity, and submission format — so incoming tenants' own Category B contractors have clear guidelines from day one of their lease.

Optional — on request Speeds tenant fit-out approval
06
Handover

Lease-Ready Units & Landlord Sign-Off

Each unit is handed over to Category A standard with as-built drawings, warranties, and compliance certificates — ready to market and ready for a tenant's Category B fit-out to begin immediately.

Lease-ready standard Full handover pack
Where We Work

Commercial Space Delivery Across Dubai

RNM delivers Category A base-build and landlord fit-out programmes across Dubai's major commercial districts — for single buildings and multi-asset portfolios alike.

01

Business Bay

Landlord Category A delivery across Business Bay office towers — Dubai's most active leasing district.

02

DIFC

Premium Category A base-build in DIFC — familiar with DIFC Authority landlord submission requirements.

03

JLT & DMCC

Multi-floor landlord rollout across JLT and DMCC towers — consistent Category A specification across a full building.

04

Downtown Dubai

Landlord base-build and vacant unit refurbishment in Downtown Dubai — EMAAR building guidelines managed.

05

Sheikh Zayed Road

Commercial base-build along Sheikh Zayed Road's dense office and showroom corridor — multi-tenant building coordination.

06

Dubai Marina

Landlord base-build for office and retail units across Dubai Marina towers.

07

Palm Jumeirah

Landlord fit-out for retail and F&B units on Palm Jumeirah — Nakheel building standards.

08

Abu Dhabi & GCC

Selected landlord and developer projects in Abu Dhabi and the GCC — contact us to discuss.