Bespoke office interior design and turnkey fit-out for corporate headquarters, SME offices, and financial services firms across Dubai — workstation planning, brand-led reception design, and Category A and B fit-out delivered in-house.
RNM delivers every stage of your office project in-house — design, documentation, landlord and authority approvals, fit-out, and bespoke joinery — under one fixed-price contract, built around your move-in date. See our commercial design service or speak to our team today.
Design, documentation, fit-out, and joinery delivered by one team under one contract — no coordination between separate designers and contractors required from you.
Office fit-outs run against a lease commencement date, not a flexible deadline. RNM programmes the entire project backward from your move-in date.
Dubai Municipality, DEWA, DIFC Authority, and landlord or developer NOC — EMAAR, Nakheel, DMCC — managed entirely in-house on your behalf.
From a first SME office to a multi-floor corporate headquarters — RNM designs and delivers office interiors across Dubai that support how your team actually works, and represent your brand accurately to clients.
Multi-floor headquarters design — workstation density planning, executive offices, boardrooms, and brand integration across every floor.
Space Planning →Cost-efficient, smart-layout office design for growing teams — flexible workstation zones that scale as headcount grows, without a second fit-out.
Commercial Design →Law firm, financial services, and consultancy office design — client-facing meeting rooms, confidentiality-conscious layouts, and DIFC-grade finish standards.
Design & Build →Reception, brand walls, and wayfinding design — the first five metres of your office, built in bespoke joinery to represent your brand accurately.
Bespoke Joinery →AV-ready meeting rooms, boardrooms, and informal collaboration and breakout zones — acoustic treatment and technology integration planned from the outset.
Layout & Zoning →Shell-and-core to Category A base build, and Category A to fully fitted Category B — both scopes delivered under a single fit-out contract.
Fit-Out Contracting →
An office fit-out that's still snagging in week one of the lease is a cost to your business, not just an inconvenience. RNM plans every project to be fully operational — desks, meeting rooms, and IT-ready — by the date your team is due to move in.
Same team designs and builds — no gap between design intent and site execution. Faster programme, tighter cost control.
We plan to your lease start date, not ours. Critical path managed in-house with weekly progress reporting to your team.
DM, DEWA, DIFC Authority, and landlord or developer NOC — all submitted and tracked by our team. No third-party approval delays.
Agreed cost before work begins. The number in the proposal is the number on the final invoice — always.
An office move involves more than fit-out — landlord approvals, IT and furniture coordination, and handing back your old space all have to land on schedule. RNM manages the full sequence from one team.
We review your lease commencement date, landlord fit-out guidelines, and any fit-out period built into the lease, then work backward to confirm a realistic design and construction programme before any drawings begin.
Dubai Municipality-standard drawings and the landlord or developer NOC package — EMAAR, Nakheel, DMCC, DIFC Authority — are produced in parallel during design, formatted to your specific building's requirements.
RNM submits the landlord NOC, Dubai Municipality drawings, and DEWA application together — sequencing submissions so approvals progress in parallel rather than waiting on each other.
Civil, MEP, and joinery works are sequenced against the confirmed programme — with weekly progress reporting so your operations, HR, and IT teams can plan the move with confidence.
RNM coordinates site access windows for your IT, AV, and furniture suppliers so cabling, screens, and workstations are installed in sequence with the fit-out — rather than as a separate, disruptive phase after handover.
Joint snagging walkthrough and sign-off on the new office. If you're vacating an existing space, RNM can also manage the dilapidations works to return it to its original condition — one team handling both ends of the move.
RNM delivers office interior design and fit-out across all of Dubai's major business districts — from DIFC financial services floors to Business Bay corporate towers.
Corporate and SME office fit-out in Business Bay — Dubai's most active corporate district, Category A and B delivery.
Premium financial services office fit-out in DIFC — fully familiar with DIFC Authority requirements and submission process.
Office fit-out across JLT and DMCC towers — building management approvals and DMCC free zone requirements handled in-house.
Corporate office interior design in Downtown Dubai — EMAAR commercial guidelines and NOC managed.
Office design along Sheikh Zayed Road's high-profile commercial towers — complex building management approval requirements managed.
Office and business-centre fit-out across Dubai Marina towers, alongside retail and F&B units.
Boutique office and business-centre design on Palm Jumeirah — hospitality-adjacent commercial spaces.
Selected office projects in Abu Dhabi and the GCC — contact us to discuss availability.
12,000 sq ft · Full design & build, executive floor & boardroom joinery
6,800 sq ft · Space planning, bespoke joinery & meeting room fit-out
3,400 sq ft · Category B fit-out, reception & breakout joinery
Answers to the questions businesses ask us most often before planning an office fit-out or relocation in Dubai.
Office design-only documentation typically starts from AED 150/m². Full design and Category B fit-out ranges from AED 300 to AED 600/m² depending on specification, joinery, and AV/IT integration complexity. A fixed-fee proposal is provided after the initial consultation. See our cost guide.
A typical office fit-out of 3,000–5,000 sq ft runs eight to fourteen weeks from design sign-off to handover, depending on scope, landlord approval timelines, and joinery complexity. RNM plans the full programme against your lease commencement date from day one.
Yes. We coordinate the fit-out programme, IT and furniture supplier access, and — where needed — a phased move so that critical business functions are never without a working space. Weekly progress reporting keeps your operations team informed throughout.
Yes. Alongside the new office fit-out, RNM can manage dilapidations works to return your outgoing space to its original condition per the lease agreement — coordinated as part of the same relocation programme.
Category B fit-out covers the full tenant fit-out on top of the base build — partitioning, joinery, flooring, ceilings, lighting, meeting room AV first-fix, branding, and all finishes to move-in ready standard. RNM delivers Category A base build and Category B fit-out both.
Yes. RNM schedules site access for your IT, AV, and furniture suppliers within the fit-out programme so cabling, screens, and workstations go in on sequence with construction — rather than as a separate phase that delays your move-in date.